Doran Construction   License No.

 819463, HIC

 
  Drainage - 2:

Client informed us that his property's main drain pipe has moved out of place and he fears with next rain it will fall into creek down below.  
1- First glance confirmed that soil around pipe was washed.
2- Looking from below showed that pipe has moved and tilting downward.

3- looking inside the pipe showed at least two of the pipes have moved.
4- We started by removing dirt from top of the pipes. Picture shows about 4 inches of movement in first section piece.

5- Uncovering the rest of the pipes revealed movement in section of pipe.

 6- To begin, we moved the first two pieces out of their place.
7-Then we removed soil from around and under the pipes. we supported the pipe weights with concrete cinder blocks.
8- We prepared base for a facade that property owner was going to add in future.
9- Final adjustments to the pipes are made and rebars are being set.
10- Everything is ready to for pouring concrete.
11- Concrete is poured,
12- Base for future facade is being trawled.
13- After concrete was poured, we waited 48 hours for curing.
14- Then we removed the forms.
15- Mounted a plywood on top of the pipes to hold the dirt in place and put a tarp under the pipe. our part of project was finished. Property owner was going to install a prefab facade and shoot.